Purification and Zakat (for long-term investing) calculations are in USD per share and based on AAOIFI methodology. AAOIFI requires purification every financial period (e.g. quarterly).
If you follow S&P Shariah’s Dividend-only purification, then remove the impure income % from the dividends you receive. No purification required for non-dividend paying stocks, according to S&P Shariah.
For Zakat, if you did not invest in a company from a long term perspective, then consider the shares as trading goods and give 2.5% of the total value if a year has passed on them.
Company Profile
GCM Resources plc is a United Kingdom-based mining and energy company. The Company is engaged in the development of the Phulbari Coal and Power Project (the Project) in north-west Bangladesh. The Phulbari Coal and Power Project is located in the Dinajpur District of Northwest Bangladesh, approximately 350 kilometers from the capital, Dhaka, and 10 kilometers from the Indian border. The region is some 30 meters above sea level, relatively flat and comprised of an alluvial plain with slightly raised terraces formed in pre-historic times by the drainage of the sub-Himalayan River systems (the Ganges/Padma and Jamuna rivers). The Phulbari Coal and Power Project’s mine footprint covers an area of 5,193 hectares. Some 80% of the area is open fields under agriculture. The Company’s subsidiaries include South African Coal Limited, Asia Energy Corporation Pty Limited, Asia Energy Corporation (Bangladesh) Pty Limited and Asia Energy (Bangladesh) Pvt Ltd.
GCM - GCM Resources plc
Report
There was a problem reporting this post.
Block Member?
Please confirm you want to block this member.
You will no longer be able to:
See blocked member's posts
Mention this member in posts
Please allow a few minutes for this process to complete.