W S Industries (India) Ltd

WSIN.IN

$1.74

Closing

▲0.55%

1D

▲27.78%

YTD

Market cap

$87.60M

52 week high

$2.32

52 week low

$0.66

Volume

97,253

Check if the stock is halal

Unlock Industry-grade Shariah Compliance for global stocks. See results from 5 major Shariah standards: AAOIFI, S&P, DJIM, FTSE and MSCI.

We provide unparalleled value and service.
Screened by AAOIFI Certified Shariah Advisor & Auditor.

Get started from just $3.99/month

Market cap

$87.60M

Analysts' Rating

-

Price Target (Mean)

Unable to collect data for some field(s).

Total Analysts

0

P/E

24.84

Operating Margin

15.51%

Beta

0.71

Revenue Growth (Annual)

0.00%

52 week high

$2.32

52 week low

$0.66

Div. Yield

%

EPS Annual Growth

0.00

Note on Purification and Zakat

  • Purification and Zakat (for long-term investing) calculations are in USD per share and based on AAOIFI methodology. AAOIFI requires purification every financial period (e.g. quarterly). 
  • If you follow S&P Shariah’s Dividend-only purification, then remove the impure income % from the dividends you receive. No purification required for non-dividend paying stocks, according to S&P Shariah.
  • For Zakat, if you did not invest in a company from a long term perspective, then consider the shares as trading goods and give 2.5% of the total value if a year has passed on them. 

Company Profile

W.S. Industries (India) Limited is an India-based holding company. The Company is focused on infrastructure and electrical project handling. The Company’s segments include Turnkey Projects and Infra Division. Its projects include Civil Projects, turnkey projects and IT/ITES Projects. The Civil Projects include Macro Drain in Pallavaram, Integrated Storm Water Drain Works in Kovalam and Integrated Bus Terminal and Multi Utility Facility Center. Turnkey Projects business unit undertakes design, engineering, supply, installation, testing and commissioning of HV & EHV substations and transmission lines up to 765kV voltage level. Its processes are project initiation, project planning, project execution, project monitoring and control and project closeout. Integrated Storm Water Drain Works in Kovalamcproject involves building integrated stormwater drain systems in the M1 and M2 components of Kovalam Basin, located in the expanded areas of Greater Chennai Corporation Package M24.